Beginning my all 2" PVC RV shelter.

Hi, all! I have just broken ground for my 31' X 12' x 18' (peak) all 2" PVC, RV shelter. I will post pics as I proceed. So far, I've invested $50 for the four-way corner couplings (6). At my cost-out projection, I should spend, about, $1000, total, on this project. My goal is to keep my brand new Springdale 252RL out of the blazing Texas summer sun, from here on. Comparable kits, online, get into the $1.6-3.0 G's range. We'll see how this goes. I've built free-standing screen houses and sheds, my designs, before. No problems.

If any of you, out there, have some great ideas, having built a shelter before, yourself, please let me know, here. I'm always open to sound advice, based on past experience. Thanks!
Miles65 is offline   Reply With Quote
Old 08-14-2018, 11:15 AM   #2
Bisjoe
Senior Member
 
Join Date: Sep 2017
Location: Sammamish
Posts: 256
It should be a fun project. I built a greenhouse, 7' wide, 7' high and 12' long using 1/2" PVC. In my case I drilled 3" into the edges of the wood 2x6 raised bed frame, and inserted 12" rebar, so that the PVC uprights slid right onto them. How are you securing to the ground so the whole thing doesn't blow away? Also, be sure to peak or slant the roof so water sheds off, or the weight can collapse it. Even with really tight fabric it will stretch in time and sag, creating a pond effect. I bent 8' PVC to make a rounded top, but still had to go inside and bang off snow when we got 2" or more. I never glued any of the PVC, just stuck it tight together, because the clear plastic film I used is stapled to the wood on the bottom and keeps it together, and I can easily disassemble if I need to. Post a picture when you get it done, or even better, a few showing your progress.
__________________
2017 Springdale 202QBWE, 2017 F150 XLT 5.0

Bisjoe is offline   Reply With Quote
Old 08-14-2018, 11:58 AM   #3
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
I have dug a 2"deep, rectangular trench to inset my base, which is joined. The PVC should be able to stand up to drive-over, when it's snug in the trench. My roof will be made of 45° couplings joined to 8.5' 2" PVC. The rise comes out to about six feet. I may splice in 4-way T's mid roof, to add cross pieces for strength, with 3-way T's on the perimeters. I am building the roof, first, on the ground, to see if I'll need the cross pieces. The roof, itself, will have tarps over it, held very tightly by adjustable cordage. The complete structure may be guyed, at its corners and mid sections. I'll see how sturdy it feels, once completed.
Miles65 is offline   Reply With Quote
Old 08-15-2018, 06:23 AM   #4
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
STEP 1 : I have dug a 2" deep trench, after setting my string line and checking for 90º corners with the strings marked at 3' and 4' to give the hypotenuse of 5'. The challenge will come when I lay my pipe and then work to get level, since my yard slopes up to the fence line, albeit to a very, very slight degree. I'll use my long level to check each side of the run, and dig or fill in the trench as needed. My main concern is that the front run, the one the trailer will go over as it's backed into the shelter, is completely in the trench to lessen the chances of it cracking and/or offering any resistance as I back my RV in.
Attached Thumbnails
Click image for larger version

Name:	excavation 1.jpg
Views:	256
Size:	468.0 KB
ID:	18057   Click image for larger version

Name:	excavation 2.jpg
Views:	255
Size:	421.7 KB
ID:	18058  
Miles65 is offline   Reply With Quote
Old 08-15-2018, 06:44 AM   #5
Bisjoe
Senior Member
 
Join Date: Sep 2017
Location: Sammamish
Posts: 256
As long as you use Schedule 80 you should be OK to drive over it, though I would suggest filling that piece from the ends with spray foam insulation beyond the points where the wheels will go over it for a bit more rigidity, or even just fill it with soil.
__________________
2017 Springdale 202QBWE, 2017 F150 XLT 5.0

Bisjoe is offline   Reply With Quote
Old 08-15-2018, 06:56 AM   #6
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
Quote:
Originally Posted by Bisjoe View Post
As long as you use Schedule 80 you should be OK to drive over it, though I would suggest filling that piece from the ends with spray foam insulation beyond the points where the wheels will go over it for a bit more rigidity, or even just fill it with soil.
I am planning on using Schdl 40, but I like your idea of filling the pipe with soil. I'll do that, or use sand, after capping the end with foam, internally, before I glue it to the elbows. Thanks! In researching loads on Schdl 40 pipe, it seems pretty indestructible, especially if it's buried, a bit. Lots of guys post about driving trucks over S40 that's laying flat on the ground, with no trouble. If it did crack, it wouldn't be that big a deal. I could always saw out the bad part, and replace with a new piece, using slip connectors.
Miles65 is offline   Reply With Quote
Old 08-15-2018, 12:35 PM   #7
wiredgeorge
Senior Member
 
wiredgeorge's Avatar
 
Join Date: Nov 2017
Location: Mico, TX
Posts: 7,392
PVC is easy to work with but I am guessing there will be a canvas or similar cover? What will keep this deal from blowing away in the wind if it isn't anchored?
__________________
wiredgeorge Mico TX
2006 F350 CC 4WD 6.0L
2002 Keystone Cougar 278
2006 GL1800 Roadsmith Trike
wiredgeorge is offline   Reply With Quote
Old 08-15-2018, 01:51 PM   #8
Steveo57
Senior Member
 
Join Date: Dec 2017
Location: Lisbon
Posts: 551
I wonder if it would work to fill the buried piping with cement. That would give you strength and weight to help hold the whole thing down.

Sounds like an interesting project and something I've thought about doing so I'll be watching your progress!
__________________
2018 Keystone Cougar 22RBS
2020 Ford F-350 XLT SC SRW 6.7l Powerstroke.
Steveo57 is offline   Reply With Quote
Old 08-15-2018, 04:25 PM   #9
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
Quote:
Originally Posted by wiredgeorge View Post
PVC is easy to work with but I am guessing there will be a canvas or similar cover? What will keep this deal from blowing away in the wind if it isn't anchored?
I will cover the roof with two very large tarps, held taut by cordage.

Where I'm placing the shelter is somewhat away from any wind, since it's at the back of my yard and surrounded by a fence, brush and a shed. As I mentioned, above, I may guy it out when I'm done, if it seems like it wants to go Wizard of Oz on me.
Miles65 is offline   Reply With Quote
Old 08-15-2018, 04:33 PM   #10
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
Quote:
Originally Posted by Steveo57 View Post
I wonder if it would work to fill the buried piping with cement. That would give you strength and weight to help hold the whole thing down.

Sounds like an interesting project and something I've thought about doing so I'll be watching your progress!
You guys are giving me some interesting ideas. Filling the entrance pipe with cement might take some doing, although I suppose if I use a funnel and a fairly liquefied cement mix, I'd be able to fill the pipe. Problem then would be enough airflow to allow the cement to harden. Still, the weight would be there to help hold down the front end.

I'm also thinking about sinking rebar hooks into the ground, over the base pipes, using cement around the rebar, as well, to add weight and hold the rebar down, more effectively. I may use rebar in the shape of "∩".

Lots of things to consider. My corner fittings won't be here for another week, so I've got time. Keep the ideas coming. Thanks!
Miles65 is offline   Reply With Quote
Old 08-15-2018, 05:00 PM   #11
Bisjoe
Senior Member
 
Join Date: Sep 2017
Location: Sammamish
Posts: 256
I would fill the pipe with sand, and if it becomes a problem, you could always protect it with concrete over the pipe, a lot easier to do. We used to use rebar to anchor the big full sized soccer goals, and we would use 3’ length, and drive them nearly all the way into the ground at a very sharp angle, then weld to the bottom of the frame. On the sides, you could just drill holes at an angle through the pipes and drive in 2’ pieces. Bending it into a U shape is not easy and the can still pull out if vertical, 90 degrees to the ground.
__________________
2017 Springdale 202QBWE, 2017 F150 XLT 5.0

Bisjoe is offline   Reply With Quote
Old 08-17-2018, 12:37 PM   #12
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
Just ordered all of my couplings/fittings. Total is $215.36. Pipe should be another $650, so I'm doing OK, budget-wise. I found a 32X20 tarp, online, for $85. I'll still need the rebar for staking the structure, and the purple primer and glue. All in all, I think I should just about hit the $1000, total, that I was aiming for.
Miles65 is offline   Reply With Quote
Old 08-17-2018, 12:49 PM   #13
travelin texans
Senior Member
 
travelin texans's Avatar
 
Join Date: Nov 2017
Location: Picacho, Az
Posts: 6,809
Just FYI! I haven't used the purple primer in years. Get the Rain n Shine (I think that's the name) glue, 1 step only, no primer & you can use it if water is running out of the pipe. It's blue, so if purple is your favorite color might stick to using the primer.
You can also pour the dry cement into the pipe, it will still set up from just condensation in the pipe. When setting fence post I just tamp dry sack crete around post & sprinkle a bit of water on top, done.
__________________
Full-timed 10+ years
Sold '13 Redwood FB
Traded '13 GMC Denali DRW D/A
Replacement undetermined
travelin texans is offline   Reply With Quote
Old 08-17-2018, 12:58 PM   #14
RoscoeV
Senior Member
 
Join Date: Aug 2017
Location: Three Way
Posts: 139
I have seen builds where the poles had a "T" on the bottom and were placed in buckets filled with cement which were buried in the ground. They looked pretty sturdy and you wouldn't have to drive over any part of the PVC.
__________________
USMC Vietnam Veteran
2019 Laredo 325RL
Andersen Ultimate 5th Wheel Connection
2018 Ram 2500 Laramie
Pathway X2 with DISH Wally
RoscoeV is offline   Reply With Quote
Old 08-17-2018, 01:11 PM   #15
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
Quote:
Originally Posted by RoscoeV View Post
I have seen builds where the poles had a "T" on the bottom and were placed in buckets filled with cement which were buried in the ground. They looked pretty sturdy and you wouldn't have to drive over any part of the PVC.
Hmm - - - That sounds like a good idea, but I have already ordered the fittings to give me a continuous, rectangular base. I may sink the rebar hold-downs into cement, though. If the front, drive-over pipe breaks, despite being completely in the trench, it'll not be that big of a deal, since the base, itself, will be completely in the trench, too.
Miles65 is offline   Reply With Quote
Old 08-17-2018, 03:32 PM   #16
cavediver
Senior Member
 
Join Date: Jun 2018
Location: Swanton
Posts: 188
I believe cement is a chemical reaction it doesn't need air to cure. Sand should be enough. What about the PVC and UV rays?

Jack
cavediver is offline   Reply With Quote
Old 08-17-2018, 06:12 PM   #17
Bisjoe
Senior Member
 
Join Date: Sep 2017
Location: Sammamish
Posts: 256
Quote:
Originally Posted by cavediver View Post
I believe cement is a chemical reaction it doesn't need air to cure. Sand should be enough. What about the PVC and UV rays?

Jack
My greenhouse is 4 years old with only clear over it, and no sign of degradation of the pvc pipe from sun. Of course, we don’t get much of that here.
__________________
2017 Springdale 202QBWE, 2017 F150 XLT 5.0

Bisjoe is offline   Reply With Quote
Old 08-17-2018, 08:19 PM   #18
Alpine
Senior Member
 
Alpine's Avatar
 
Join Date: Aug 2013
Location: Oregon
Posts: 783
Here is an idea (not sure if it's a good one?) Reading where a guy filled his PVC with water! So if needed to be moved later on, drill a small hole and drain. He did use a mixture of Antifreeze as he was in colder weather during the winter.
__________________


Jeff & Jan - Retired & Full-timing since 2013
2019 Ram Big Horn 3500 Aisin 4x4
2012 Alpine 3450-RL
Double Coin 235/75R-17.5/16 J rated 125lb
Alpine is offline   Reply With Quote
Old 08-21-2018, 05:11 AM   #19
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
Quote:
Originally Posted by Alpine View Post
Here is an idea (not sure if it's a good one?) Reading where a guy filled his PVC with water! So if needed to be moved later on, drill a small hole and drain. He did use a mixture of Antifreeze as he was in colder weather during the winter.
I'd be worried about the weight on the roof pipes. I suppose I could fill right up to the third level framing, and then leave the roof pipes empty. Interesting idea.

UPDATE: We have up to ninety 100º+ days in Austin. I'd be concerned that the pipes might become pressurized by the heated water inside them, even with empty roof pipes serving as an expansion check. Then, I'd need to install relief valves in a few places in the system, on the roof pipes. I think I'd be making the project more complicated than necessary. No water, for my pipes.
Miles65 is offline   Reply With Quote
Old 08-21-2018, 05:20 AM   #20
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
Cost is going down! I found a local vendor for the pipe. I did order the fittings, online. The 600' of Sch 40, 2" PVC pipe will run me $370, total. The fittings were $165. The tarp will be about $100. The cement will be about $50, and I will be buying the glue that sets up slower than the "normal" stuff, since plumb and level are ultra-crucial, right up to the final placement of the 45º roof peak caps. One small error, and I'm stuck (pun?) improvising with flexible couplings for the final connections. So, total cost for this project is now seen to be approximately $700, and you can't beat that, anywhere, unless you have the materials just sitting around. I may have been able to shave another $50 off if I had found the local vendor, first, and bought my fittings from him, although I need some out of the ordinary ones that he may not have carried.
Miles65 is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3
Disclaimer:

This website is not affiliated with or endorsed by the Keystone RV Company or any of its affiliates in any way. Keystone RV® is a registered trademark of the Keystone RV Company.


All times are GMT -8. The time now is 12:55 PM.


Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.