Finally got around to putting my solar panels up. I used some strut track and angled solar panel mounts to attach to the roof. I finished just too late yesterday to see how much I would get out of them and of course it is cloudy and dark today, so I will have to see the results this weekend, but it's done!
These are two Newpowa 200W, 24V panels in parallel feeding an Aims Power 30A MPPT charge controller. I have 465Ah of battery storage in total and a 1.5kW low frequency inverter feeding the pre-wired solar circuit. The OTG pre-wire option on the rig made this so much easier than it could have been.
Here's a pic of the 400Ah battery I built for the rig. This is in parallel with the crappy lead acid on the tongue that I can switch to if this dies.