Quote:
Originally Posted by NH_Bulldog View Post
Just a thought; you mention that the current 200w panel has 12-gauge wiring and that the wiring from the roof is 10-gauge? If there is one 10-gauge wire from the roof, you cannot just add another panel and run two panels through that single 10-gauge wire, you will need to add a second 10-gauge wire or upgrade the existing 10-gauge to 8-gauge to accommodate the increased power. Like Stircrazy mentioned, a 40A controller (or larger) would also be needed.

For example;
14 AWG for 15A
12 AWG for 20A
10 AWG for 30A
8 AWG for 40A
6AWG for 55A
.
not necessarily, if you run them in series, you will not increase the amperage just the voltage, which is what I would do in his situation. he would still need a new controller that is a MPPT one to do it and to make sure that controler will handle the two panels in series which a renogy 40 amp will as it can handle two 24V panels in series without spending the extra money on the Victron if you don't need to.
Stircrazy is offline   Reply With Quote