Quote:
Originally Posted by JJaxon
...
Makes sense to remove the factory installed feedthrough and place the combiner box there, as the hole is already there.
|
Hmmm. I think that presupposes the factory left you enough slack in the roof/attic to lift the factory gland, cut the wires from the back of their gland, and feed those wires up into your combiner box. Can you determine in advance that there's either enough slack wire, or that you could feed new replacement wire up to the rooftop from inside if you had to?