View Single Post
Old 08-14-2018, 11:58 AM   #3
Miles65
Member
 
Miles65's Avatar
 
Join Date: Jun 2018
Location: AUSTIN
Posts: 88
I have dug a 2"deep, rectangular trench to inset my base, which is joined. The PVC should be able to stand up to drive-over, when it's snug in the trench. My roof will be made of 45° couplings joined to 8.5' 2" PVC. The rise comes out to about six feet. I may splice in 4-way T's mid roof, to add cross pieces for strength, with 3-way T's on the perimeters. I am building the roof, first, on the ground, to see if I'll need the cross pieces. The roof, itself, will have tarps over it, held very tightly by adjustable cordage. The complete structure may be guyed, at its corners and mid sections. I'll see how sturdy it feels, once completed.
Miles65 is offline   Reply With Quote