Just an update that I have scraped all the remaining insulation from the back wall filon / fiberglass. It is a time consuming task and I am on a total strip down and rebuild of the slideout. My tool has mostly been a oscillating tool with a scraper blade followed up by lite sanding.
I did order some 3m 1357 for the outside lamination. I have the materials for the inside portion and will start on that first. Once completed I will let it sit for fourty-eight hours before the install.
In the mean time I have the side walls to work on and frames, the frames have tons of fasteners in the form of 3/4" nails and staples. Once removed I am running a floppy disc over the frame to remove any remaining adhesive or wood.
Work, family, weather and the old supply chain issues are slowing progress down
__________________
2013 Keystone Bullet Premiere 33 BLPR
2012 Ram 2500 with Ram Boxes
Army, 7th ID 7th MP Co
Retired LEO
9-1-1 Director
|