View Single Post
Old 01-27-2022, 01:12 PM   #35
JRTJH
Site Team
 
JRTJH's Avatar
 
Join Date: Mar 2011
Location: Gaylord
Posts: 26,997
Quote:
Originally Posted by rlh1957 View Post
I must give credit… I didn't do my install but worked with Northern Arizona Wind & Sun in Flagstaff, AZ.
Via phone and email we worked out a system design that met our needs. I took photos and measurements so that when we arrived they had all parts staged and ready. Backer board cut and equipment mounted & wired do they just lifted into place.

I don’t know if they fished the wires from roof or used the prewire to back-pull.

They upgraded the roof run wires snd installed new box with MC4 because Keystone on 2020 models were using some other standard connector. Keystone was pushing ZAMP then.
We have 8 panels totaling 2200Watts, 3000Watt Victron Inverter, 2 charge controllers- 1 Victron SmartSolar MPPT 100/50 & 1 Victron SmartSolar MPPT 250/150 charge controller, Victron MultiPlus 3000 Inverter/Charger.

We left it with them 3 days so we could tour area while they worked at their pace.

Very please with professional work and performance.
Just out of curiosity, what did a system like that cost ?????
__________________
John



2015 F250 6.7l 4x4
2014 Cougar X Lite 27RKS
JRTJH is offline   Reply With Quote