Originally Posted by rlh1957
I must give credit… I didn't do my install but worked with Northern Arizona Wind & Sun in Flagstaff, AZ.
Via phone and email we worked out a system design that met our needs. I took photos and measurements so that when we arrived they had all parts staged and ready. Backer board cut and equipment mounted & wired do they just lifted into place.
I don’t know if they fished the wires from roof or used the prewire to back-pull.
They upgraded the roof run wires snd installed new box with MC4 because Keystone on 2020 models were using some other standard connector. Keystone was pushing ZAMP then.
We have 8 panels totaling 2200Watts, 3000Watt Victron Inverter, 2 charge controllers- 1 Victron SmartSolar MPPT 100/50 & 1 Victron SmartSolar MPPT 250/150 charge controller, Victron MultiPlus 3000 Inverter/Charger.
We left it with them 3 days so we could tour area while they worked at their pace.
Very please with professional work and performance.
|