Quote:
Originally Posted by chuckster57
Only thing I think you missed is the limit switch, that is verified before the sail switch.
|
Chuck,
If I remember the "yes/no logic tree" correctly, the limit switch is verified closed during the ">9.5VDC check". If the limit switch is open, there will be no "minimum voltage and the system shuts down in step #1. So, even though it's not "stated as being in the start-up sequence" the limit switch is verified closed and functional in "step #1"....