The wallboard was all damaged where it was taken off at. I will be doing the repairs myself, different wallboard will be installed then the entire interior painted a different color. So far just 1 and 1/2 ceiling panels will be changed.
I have the kitchen cabinets out and everything above the slide out is drying nicely. All damaged areas are covered with tarp so it can dry, be dissasembled, and recaulked.