Thread: Solar Confusion
View Single Post
Old 07-12-2019, 06:14 PM   #15
LCrabtree
Member
 
Join Date: Sep 2018
Location: Paige
Posts: 33
My Bullet 19' appears to be "solar ready"; but from this thread I gather that only means that there are two wires from the plug to the 12V system (with a fuse) connected somewhere ... seems to me easier and simpler to mount the charge controller where it's convenient but not in the way, and then wire directly to the batteries, disregarding the pre-wired solar ready crap?

Unless, of course the pre-wired solar ready means that there are wires in the fuse box labeled for the solar system that can be accessed and used, along with room to mount the solar charge controller...

Larry
LCrabtree is offline   Reply With Quote