View Single Post
Old 01-14-2020, 06:14 PM   #82
Gegrad
Senior Member
 
Gegrad's Avatar
 
Join Date: Jul 2017
Location: Monroeville
Posts: 1,550
Quote:
Originally Posted by JRTJH View Post
Thanks for the link. That's the HDPE panel I bought. When I search the local store there's no availability (doesn't come up) but your link does show it available, at least in the warehouse. That's good news to me.

Gegrad, I used 1.25" self tapping screws. The trailer floor is 2" (plus a little) and the HDPE panel is 0.25, so by the time they thread through the panel, the 1/32 outrigger and the 1/8" frame member, there's a tad bit less than 1". Since the first 3/8" is drill point/hole maker, that leaves about 1/2" of threaded screw through the metal members.
Great, thanks John. Did you unbolt the outriggers and run the HDPE above them, between the outrigger and the base of the wheelwell? I can't tell from the pics. My outriggers have a nut exposed on the bottom for the bolt that come down from above. It would be fairly difficult for me to get HDPE or other product above my outriggers. It looked like you had screwed the HDPE up to the floor at the corners, so that is why I am asking.
__________________
2014 Bullet Premier 29bh in Charocal
2019 Ram 2500 HD 4x4, CC, 6.4L
2011 Passport 2510RB (Sold)
Gegrad is offline   Reply With Quote