Been thinking of doing this myself.
So.
Install a 120 v switch at panel, will require cutting feed to HWT, installing a junction box and carrying a 2 wire to the switch.
Or
Install a 12 v switch at panel and install a relay in the feed to the HWT.
Not sure which to do.
There is 12 DC available in the switch panel, so that is not an issue. The 120 v switch at HWT has already failed so I am bit concerned about the ability of those small rocker switches to be carrying that ampacity.
__________________
Brent W
2019 Duramax dually
2015 Fuzion 325
2008 Goldwing
|