View Single Post
Old 06-23-2017, 09:41 PM   #23
scottz
Senior Member
 
scottz's Avatar
 
Join Date: Apr 2017
Location: Colorado Rockies
Posts: 152
Ok, starting to plan my solar panel system installation. I purchased the Renogy 400W kit with the Adventurer controller.

I'm thinking of installing the controller in the cabinet above the InCommand control panel and tying into the DC system on the back of the Progressive Dynamics Power Control Center. I'll come through the roof directly into the wall behind this cabinet. This will save me the trouble of pulling wires to the front battery compartment; in any case, there is not enough cable in the kit to reach the battery compartment.

The only issue I see with this is not being able to use the connections from the controller to the batteries (AGM) for temperature and voltage sense. As I understand it, these are optional.

Anyone see any problems with this plan?

Thanks
Attached Thumbnails
Click image for larger version

Name:	Power & Control cabinet -2.jpg
Views:	292
Size:	525.9 KB
ID:	13168  
__________________
Scott & Alta
2017 Montana 3160RL, Legacy Edition, Full Body Paint, Onan 5.5Kw
2019 Ford F450 PSD
scottz is offline   Reply With Quote